{"id":62,"date":"2014-01-29T12:05:56","date_gmt":"2014-01-29T12:05:56","guid":{"rendered":"http:\/\/twinnsustainabilityinnovation.com\/?page_id=62"},"modified":"2018-04-06T23:43:16","modified_gmt":"2018-04-06T23:43:16","slug":"experience","status":"publish","type":"page","link":"https:\/\/twinnsustainabilityinnovation.com\/?page_id=62","title":{"rendered":"Masterplanning"},"content":{"rendered":"<p><em style=\"line-height: 1.714285714; font-size: 1rem;\"><b><a href=\"http:\/\/twinnsustainabilityinnovation.com\/?attachment_id=626\" target=\"_blank\" rel=\"attachment noopener wp-att-626\"><img loading=\"lazy\" class=\"alignleft wp-image-626 size-thumbnail\" src=\"http:\/\/twinnsustainabilityinnovation.com\/wp-content\/uploads\/2014\/02\/Barangaroo-\u00a9Rogers-Stirk-Harbour-150x150.jpg\" alt=\"Barangaroo \u00a9Rogers Stirk Harbour\" width=\"150\" height=\"150\" \/><\/a><\/b><\/em><em><b>Barangaroo Development, Sydney<\/b><\/em><br \/>\n<em>Waterfront CBD regeneration project to deliver 500,000m<\/em><em>\u00b2<\/em><em> mixed use, carbon-neutral, water positive, high density urban new-build.\u00a0 ESD concept with supporting masterplan formed basis of developers\u2019 winning bid for complete site.<\/em><br \/>\n<em>Collaborators: Rogers Stirk Harbour + Partners, Lend Lease<\/em><br \/>\n<em>Image \u00a9Rogers Stirk Harbour + Partners<\/em><\/p>\n<p style=\"text-align: right;\"><em><b>Kings Cross Central Regeneration, London<a href=\"http:\/\/twinnsustainabilityinnovation.com\/?attachment_id=681\" rel=\"attachment wp-att-681\"><img loading=\"lazy\" class=\"size-thumbnail wp-image-681 alignright\" src=\"http:\/\/twinnsustainabilityinnovation.com\/wp-content\/uploads\/2014\/02\/Kings-Cross-Central-\u00a9Miller-Hare-150x150.jpg\" alt=\"Kings Cross Central \u00a9Miller Hare\" width=\"150\" height=\"150\" \/><\/a><\/b><\/em><br \/>\n<em>Development of strategic energy &amp; water resource strategy, together with planning application preparation and negotiations for 800,000m<sup>2<\/sup> redevelopment &amp; regeneration project on previous industrial site. Design being implemented over a 10 year construction programme.<\/em><br \/>\n<em>Collaborators: Allies &amp; Morrison masterplanners, Argent<\/em><br \/>\n<em>Image \u00a9Miller Hare<\/em><\/p>\n<p style=\"text-align: left;\"><strong><a href=\"http:\/\/twinnsustainabilityinnovation.com\/?attachment_id=634\" rel=\"attachment wp-att-634\"><img loading=\"lazy\" class=\"alignleft size-thumbnail wp-image-634\" src=\"http:\/\/twinnsustainabilityinnovation.com\/wp-content\/uploads\/2014\/02\/UK-China-Eco-Cities-and-Green-Buildings-150x150.jpg\" alt=\"UK-China Eco-Cities and Green Buildings\" width=\"150\" height=\"150\" \/><\/a>UK-China Eco-cities and Green Buildings Group<\/strong><br \/>\n<em>Best Practice Guide preparation and associated engagement with Chinese municipal policymakers, sponsored by the UK Government Prosperity Fund and the Chinese MOHURD and Finance Ministries. Publication seeks to illustrate the best of UK practice for publication in June 2012. Member and contributor to the Finance section committee.\u00a0<\/em><\/p>\n<p style=\"text-align: right;\"><em><b>Dongtan Eco-City, Chongming, Shanghai<a href=\"http:\/\/twinnsustainabilityinnovation.com\/?attachment_id=664\" rel=\"attachment wp-att-664\"><img loading=\"lazy\" class=\"size-thumbnail wp-image-664 alignright\" src=\"http:\/\/twinnsustainabilityinnovation.com\/wp-content\/uploads\/2014\/02\/Dongtan-East-Village-\u00a9Arup-150x150.jpg\" alt=\"Dongtan East Village \u00a9Arup\" width=\"150\" height=\"150\" \/><\/a><\/b><\/em><br \/>\n<em>Masterplanning, concept design, technology testing &amp; associated business strategy for energy aspects of a carbon neutral city to allow a \u2018one planet\u2019 lifestyle Eco-footprint. Involved developing the governance and end user engagement mechanisms together with proof of technical systems reviews. Outline business model for procuring utilities and its influence on technical design solutions.<\/em><br \/>\n<em>Image \u00a9Arup<\/em><em>\u00a0<\/em><\/p>\n<p style=\"text-align: left;\"><em><b><a href=\"http:\/\/twinnsustainabilityinnovation.com\/?attachment_id=627\" rel=\"attachment wp-att-627\"><img loading=\"lazy\" class=\"alignleft size-thumbnail wp-image-627\" src=\"http:\/\/twinnsustainabilityinnovation.com\/wp-content\/uploads\/2014\/02\/Stratford-City-\u00a9Arup-150x150.jpg\" alt=\"Stratford City \u00a9Arup\" width=\"150\" height=\"150\" \/><\/a>Stratford City &amp; 2012 Olympic Village, London<\/b><\/em><br \/>\n<em>1,200,000 m<sup>2<\/sup> mixed-used development with 300 unit retail centre constructed on reclaimed polluted industrial site. Development of sustainability strategy, including pathway to 80% carbon reductions and community wide energy systems together with associated planning application offer. Development and implementation monitoring of Design Coding for the control rollout.<\/em><br \/>\n<em>Image \u00a9Stratford City Developments Ltd<\/em><em>\u00a0<\/em><\/p>\n<p style=\"text-align: right;\"><em><b>Beddington Zero Energy Development (BedZED), UK<a href=\"http:\/\/twinnsustainabilityinnovation.com\/?attachment_id=697\" rel=\"attachment wp-att-697\"><img loading=\"lazy\" class=\"size-thumbnail wp-image-697 alignright\" src=\"http:\/\/twinnsustainabilityinnovation.com\/wp-content\/uploads\/2014\/02\/BedZED-\u00a9Arup-150x150.jpg\" alt=\"BedZED \u00a9Arup\" width=\"150\" height=\"150\" \/><\/a><\/b><\/em><br \/>\n<em>Mixed-use sustainability development of 85 homes.\u00a0 Designed to be zero fossil energy using advanced low energy building design with carbon-neutral biomass CHP.\u00a0 Extensive water and materials recycling. Photovoltaic solar power generation for electric cars. Concept, design and implementation for buildings services, building physics and energy systems. Design concept, development and testing of wind powered heat recovery ventilation cowls.\u00a0<\/em><br \/>\n<em>Collaborators: Zedfactory Architects, BioRegional Developments, Peabody Trust.<\/em><em>\u00a0<\/em><\/p>\n<p style=\"text-align: left;\"><em><b><a href=\"http:\/\/twinnsustainabilityinnovation.com\/?attachment_id=689\" rel=\"attachment wp-att-689\"><img loading=\"lazy\" class=\"alignleft size-thumbnail wp-image-689\" src=\"http:\/\/twinnsustainabilityinnovation.com\/wp-content\/uploads\/2014\/02\/Pennbury-Ecotown-Masterplan-2\u00a9Arup-150x150.jpg\" alt=\"Pennbury Ecotown Masterplan 2\u00a9Arup\" width=\"150\" height=\"150\" \/><\/a>Pennbury Ecotown, Leicester, UK<\/b><\/em><br \/>\n<em>Integrated multidiscipline team developing the masterplan for a new zero carbon town of some 15,000 homes and 20,000m<\/em><em>\u00b2<\/em><em> of mixed use buildings. Overseeing energy concept design and the cross-discipline sustainability concept coordination. Developed business model for the community energy proposal.<\/em><br \/>\n<em>Collaborators: The Cooperative Group \u00a0<\/em><br \/>\n<em>Image \u00a9Arup<\/em><\/p>\n<p style=\"text-align: right;\"><em><b>Rockingham Environmental Technology Park<a href=\"http:\/\/twinnsustainabilityinnovation.com\/?attachment_id=670\" rel=\"attachment wp-att-670\"><img loading=\"lazy\" class=\"size-thumbnail wp-image-670 alignright\" src=\"http:\/\/twinnsustainabilityinnovation.com\/wp-content\/uploads\/2014\/02\/Environmental-Technology-Park-Twinn-150x150.jpg\" alt=\"Environmental Technology Park - Twinn\" width=\"150\" height=\"150\" \/><\/a><\/b><\/em><br \/>\n<em>Brief preparation, sustainability scope &amp; masterplanning for a new 40,000m\u00b2 business development on a previous coal-mining site. Office building type with advanced building fabric &amp; systems for cost effective carbon-neutral energy, site water autonomy &amp; closed loop material use.<\/em><br \/>\n<em>Collaborators: Bennetts Associates architects<\/em><br \/>\n<em>\u00a0<\/em><\/p>\n<p style=\"text-align: left;\"><em><b><a href=\"http:\/\/twinnsustainabilityinnovation.com\/?attachment_id=695\" rel=\"attachment wp-att-695\"><img loading=\"lazy\" class=\"alignleft size-thumbnail wp-image-695\" src=\"http:\/\/twinnsustainabilityinnovation.com\/wp-content\/uploads\/2014\/02\/Shipton-Quarry-Masterplan-Twinn-150x150.jpg\" alt=\"Shipton Quarry Masterplan Twinn\" width=\"150\" height=\"150\" \/><\/a><\/b><\/em><em><b>Shipton-on Cherwell Quarry masterplan<\/b><\/em><em><b><br \/>\n<\/b><\/em><em>Pre-planning design stage for a new development of some 2400 homes, 400 student units &amp; 40,000m\u00b2 of R&amp;D\/commercial uses. An integrated strategy for carbon neutrality, site water autonomy &amp; zero waste.<\/em><em><b><br \/>\n<\/b><\/em><em>Collaborators: FCBStudios architects<\/em><em><b><br \/>\n<\/b><\/em><\/p>\n<p style=\"text-align: right;\"><em><b>Ashford Zero Energy Development, Kent<a href=\"http:\/\/twinnsustainabilityinnovation.com\/?attachment_id=625\" rel=\"attachment wp-att-625\"><img loading=\"lazy\" class=\"size-thumbnail wp-image-625 alignright\" src=\"http:\/\/twinnsustainabilityinnovation.com\/wp-content\/uploads\/2014\/02\/Ashford-ZED-Composite-plan-Twinn-150x150.jpg\" alt=\"Ashford ZED Composite-plan - Twinn\" width=\"150\" height=\"150\" \/><\/a><\/b><\/em><br \/>\n<em>Design for mixed-use sustainability development of 1000 homes.\u00a0 Carbon neutral using low energy building design &amp; renewable energy. Responsible for integrated engineering design concept and planning approach.<\/em><br \/>\n<em>Collaborators: ZedFactory architects, Sidell Gibson Architects, ZedHomes developer<\/em><br \/>\n<em>Image \u00a9Zedhomes<\/em><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Barangaroo Development, Sydney Waterfront CBD regeneration project to deliver 500,000m\u00b2 mixed use, carbon-neutral, water positive, high density urban new-build.\u00a0 ESD concept with supporting masterplan formed basis of developers\u2019 winning bid for complete site. Collaborators: Rogers Stirk Harbour + Partners, Lend Lease Image \u00a9Rogers Stirk Harbour + Partners Kings Cross Central Regeneration, London Development of strategic &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/twinnsustainabilityinnovation.com\/?page_id=62\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Masterplanning&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":1,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/twinnsustainabilityinnovation.com\/index.php?rest_route=\/wp\/v2\/pages\/62"}],"collection":[{"href":"https:\/\/twinnsustainabilityinnovation.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/twinnsustainabilityinnovation.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/twinnsustainabilityinnovation.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/twinnsustainabilityinnovation.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=62"}],"version-history":[{"count":27,"href":"https:\/\/twinnsustainabilityinnovation.com\/index.php?rest_route=\/wp\/v2\/pages\/62\/revisions"}],"predecessor-version":[{"id":1091,"href":"https:\/\/twinnsustainabilityinnovation.com\/index.php?rest_route=\/wp\/v2\/pages\/62\/revisions\/1091"}],"wp:attachment":[{"href":"https:\/\/twinnsustainabilityinnovation.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=62"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}